background image

14

3-90-70744R11_05/13

Maintenance

The spiral chamber is basically self-cleaning  Howe er  if 
there is a draft problem and you ha e been burning wood 
for a long time with little heat demand  the spiral chamber 
may need cleaning  Soft coal will also re uire more fre uent 
cleaning  To clean  remo e sto epipe and scrape the 
creosote from the front and top of the chamber and remo e  
The rear of the chamber will not accumu late creosote

NOTE:

 1/ ” to 1/4” of creosote in the spiral chamber is normal  

Creosote can be burned off by burning coal for a few days
Firebricks may become cracked during the course of normal 
operation  A cracked brick that is still in place is still doing its 

ob and need not be re placed immediately  If a brick is broken 

and has fallen out of place  it should be replaced immediately  

7KH¿UHEULFNXVDUPDQIXUQDFHVDUHLQH[SHQVLYH

and easy to replace
The blower manufacturer recom mends the blower motor to 
be oiled once a year with 10 to 20 drops of light weight oil 

check instructions packed in blower box)

Cleaning Heat-Exchanger (SF2600 Only) -

Remo e oil burner by remo ing four mounting bolts  Burner 
can be tied up to ceiling to a oid ha ing to remo e the

 

wiring  

ext  remo e the collar from the front co er and remo e front 

FRYHUE\WLOWLQJRXWIURPWRS¿UVW1RZWKHKHDWH[FKDQJHU

will be exposed   ext  remo e the four nuts that hold on the 
co er  then remo e the co er  This will ex pose the inside of 
the heat exchanger  Remo e spirals by simply pulling them 
out and clean the tubes with a brush  Reinstall spirals so 

WKH\DUHÀXVKZLWKWKHHQGRIWKHWXEHDQGUHDVVHPEOHXQLW

in re erse of disassembly

Maintenance

Summary of Contents for SF1500A

Page 1: ...IRE MAY RESULT FOR YOUR SAFETY FOLLOW INSTALLATION DIRECTIONS CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA CONTACT YOUR LOCAL AUTHO...

Page 2: ...g 13 Maintenance 14 6SHFL FDWLRQV Coil Installation 16 Oil Burner Setup 18 Service Parts 19 Warranty 27 Contains updated information Harman Central Heating Appliances are built and tested to be comple...

Page 3: ...unction Boxes Relay High Limit Snap Disc 4 1 4 X 3 4 bolts 4 Filter Box Mounting Clips 36 Flex Conduit 1 Straight Conduit Fitting 1 Elbow Conduit Fitting Ash Pan Shaker Handle Owner s Manual Warranty...

Page 4: ...an Switch not on SF3500 Thermostat Junction Box Relay 4 1 4 X 3 4 bolts 4 Filter Box Mounting Clips 36 Flex Conduit 1 Straight Conduit Fitting 1 Elbow Conduit Fitting Ash Pan Shaker Handle Owner s Man...

Page 5: ...es above the plenum Locatethefurnaceasclosetothechimneyaspossiblewhilestillmaintaining the abo e clearances o more than feet of sto epipe should be used including two or less 90 elbows All hori ontal...

Page 6: ...nit from it s box Loosen the four bolts in the pipe on the front of the furnace Insert the nose of the oil gun into the pipe Before sliding the oil burner all the way in apply the gasket around the no...

Page 7: ...d blower EHIRUH WKH OWHU ER All hardware brackets etc for the blower will be found in the carton with the blower 1H W SRVLWLRQ WKH EORZHU LQ WKH OWHU ER FHQWHUHG behind the inlet hole and allow approx...

Page 8: ...high limit switch is packaged with a umper between the two sets of terminals inside REMO E THE J MPER WIRE I SIDE THE FA CO TROL The fan control should be installed in the right side of the plenum and...

Page 9: ...9 3 90 70744R11_05 13 SF3500 Wiring Diagram...

Page 10: ...10 3 90 70744R11_05 13 SF2600 Wiring Diagram...

Page 11: ...t is the high limit ad ustment 3UH VHW DW GHJUHHV LW V IXQFWLRQ LV WR FORVH WKH DXWRPDWLF GUDIW FRQWURO DSSHU GRRU LI WKH temperature in the plenum reaches 200 degrees Do not change this setting The c...

Page 12: ...r using the same method as before always closing the bottom door before opening the top door 1RZ ORDG WKH UHER ZLWK ZRRG WR WKH GHVLUHG IXOOQHVV OO Harman furnaces may be loaded with wood as full as p...

Page 13: ...from the door Whene er the bottom door is open it should be closed before opening the loading door This is to increase draft through the loading door and pre ent excess smoke from escaping 7KH UHER VK...

Page 14: ...f a brick is broken and has fallen out of place it should be replaced immediately 7KH UHEULFN XVHG LQ WKH DUPDQ IXUQDFHV DUH LQH SHQVLYH and easy to replace The blower manufacturer recommends the blow...

Page 15: ...l Optional Firebox Dimensions Inches 16Wx22Lx20 5H 1 Wx26Lx21 5H 1 Wx26Lx21 5H 1 Wx30Lx25H Recommended Log Length 1 in 22 in 22 in 27 in Maximum Log Length 22 in 26 in 26 in 30 in Flue Size 6 in 7 in...

Page 16: ...ele ated if necessary to allow for proper thermo siphon action The method by which hot water will circulate automatically through the system A Shut off the water heater and the water supply to it Dra...

Page 17: ...n the tank completely B Remo e the Temp Presure relief al e and discard Install a short 3 4 in nipple and tee 1 along with a new relief al e C Remo e the drain al e at the bottom of the tank Install a...

Page 18: ...ion Air C o 1 to 1 Draft Inches of water column 06 to 0 Tests for CO must be made without a fire in the wood coal firebox and with all doors and draft controls completely closed The burner should be f...

Page 19: ...of new home construction warranty co erage begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent authori ed HHT dealer distributor whiche...

Page 20: ...warranty does not co er the following KDQJHV LQ VXUIDFH ILQLVKHV DV D UHVXOW RI QRUPDO XVH V D KHDWLQJ DSSOLDQFH VRPH FKDQJHV LQ FRORU RI LQWHULRU DQG exterior surface finishes may occur This is not a...

Page 21: ...29 3 90 70744R11_05 13...

Page 22: ...ach product to a standard not a price Signature of Boxer Your premium quality hearth product designed and assembled by the experienced and skilled members at Harman in Halifax PA USA Proudly Printed O...

Reviews: