TEC0081 20150915 P/N: 630-00065 revA
SR601 • Pinnacle 101 Stair Lift Installation
19
Pinnacle 101 Stair
FOLDING RAIL INSTALLATION
12.
If you’re installing the feet onto carpet, screw
down a piece of wood or metal to make the feet
seat reliably.
[Figure 23-1]
Figure 23-2
Figure 23-1
13.
Carefully move the fork with your hand to make
sure it operates smoothly. Allow it to go all the way to
the floor. Confirm that both feet sit level on the floor
and the hinge-joint is fully straight.
[Figure 23-2]
14.
Follow the normal procedure for installing rail
brackets and tightening them. This procedure is
detailed on pages 5 & 6 (steps 7 & 8).
15.
Test ride the unit a couple of times to verify that
the folding rail is operating properly.
WARNING
Be careful not to pinch your fingers
when moving the fork.