SL300 PINNACLE STAIRLIFT:
Install Manual
26MAY2022 | 630-00100 J
11
INSTALLATION
PINNACLE STAIRLIFT: SECTION 4
CHASSIS INSTALLATION
1. Remove chassis from box.
2. Lift the chassis with the manual override hole
(on bottom) facing the downhill side of the
stairs and gently slide the chassis onto the rail
until it makes contact with the plastic rack. Do
not let the chassis free fall down the rail.
See Figure 4-15.
Figure 4-15
3. Remove the zip tie on the power switch and
turn the unit on. The unit will beep once
indicating it is ready for use.
4. Use the installation switch (the black switch
on the top of the chassis) to move the chassis
at least 24" down the rail, pushing gently on
the chassis to ensure the chassis does not pull
any rack to the top.
See Figure 4-16.
Figure 4-16
5. Loosen, but do not remove, the four (4) seat-
leveling bolts (two (2) on each side of the
chassis), and then align them vertically using
a level. Firmly tighten the two (2) bolts on the
side of the chassis facing the wall.
See Figure 4-17.
Figure 4-17
Do not ride on the chassis or lift until the
installation is complete.
WARNING
!
Be careful not to trap fingers between the rail and
the chassis.
WARNING
!
Installation
switch
Two (2) bolts on
either side of the
chassis