SL300 PINNACLE STAIRLIFT:
Install Manual
26MAY2022 | 630-00100 H
12
INSTALLATION
PINNACLE STAIRLIFT: SECTION 4
FINAL RAIL INSTALLATION
1. Install the remaining plastic rack pieces in the
upper rail.
See Figure 4-18.
Figure 4-18
2. Use a hacksaw or chop saw to cut the last
plastic rack piece flush with the rail end. Place
something on the floor to catch debris or mark
and cut the rack outside.
The exposed, cut end of the plastic rack
should be facing the top end of the rail (the
factory-cut side should butt against the lower
rack).
See Figure 4-19.
Figure 4-19
3. Slide the top limit cam into one of the cam
slots on either side, and tighten the pre-
inserted Allen screw with a 5/64" Allen wrench.
This will be used to set the final upper limit for
the stairlift.
See Figure 4-20.
Figure 4-20
4. Remove the charging strips from the rail box.
Connect the charging strip connector to the
power wire that runs through the center of
the rail from the lower charging strips.
Insert the two (2) charging strips into the
keyed slots at the top of the rail (while
standing on the top landing looking down).
The charging strip with the red wire should be
inserted into the left slot with the metal strip
facing out. The charging strip with the black
wire should be inserted into the right slot with
the metal strip pointing out.
See Figure 4-21.
Figure 4-21
Bend the red and black wire tabs in toward
the center of the track.
Insert excess cable into the rail, leaving the
pigtail with the Molex connector on the
outside.