background image

4                      Pinnacle Stair Lift manual   |                        

          |   www.Harmar.com   |   866-351-2776

table of Contents

installation Procedures

II. INSTALLATION PROCEDURES

A. DETERMINE OVERALL RAIL LENGTH (Only if track did not come pre-cut to length) 

Step 1: 

Determine any obstructions that will affect the position and length of the rail. These may include walls, 

doors, hallway orientation, etc.

Step 2: 

Measure the overall length of the stairs from the nose at the top landing of the stairs to the floor at the 

bottom (nose to floor measurement, e.g., 128”, see image below).

Step 3: 

For a normal stairway with adequate space for a landing, add 13” to the nose to floor measurement. This 

will provide enough rail length to allow the stair lift to be adjusted so that the floor-to-seat height will be the 

same at both the top and bottom (e.g., 141”).

Step 4: 

If the top landing has restrictions (i.e., a wall or doorway), use the chart below to determine the length of 

extension that should be used.

Step 5: 

To cut the rail, use a standard 12” chop saw, with a blade designed to cut aluminum. 

Do not cut rail 

inside the house (aluminum chips are very hard to remove from carpets).

tiP!

DO NOT cut the end of the rail that contains the joint holes. 
Remove the charger strips and wire harness before cutting.

Extension

          7” 

 

9” 

 

11”   

13” 

 3.9” 

 5” 

 6.1” 

 7.2” 

Horizontal intrusion on top landing

Summary of Contents for Pinnacle SL600

Page 1: ...lift for its intended purpose Any deviation from these instructions will void the LIMITED WARRANTY that accompanies the product Additionally any party installing the product who deviates from the INS...

Page 2: ...nd warnings in this manual as well as on labels on the equipment I PRELIMINARY CHECKS 3 A Tools required 3 B Included parts 3 II INSTALLATION PROCEDURES 4 A Determine rail length 4 B Rail installation...

Page 3: ...sis Bottom rail pre installed with Call send parts Bottom end plate 2 Call send hand controls Charge strip wire harness Battery charger Bottom limit cam Installation Manual Joint pins and joint bracke...

Page 4: ...with adequate space for a landing add 13 to the nose to floor measurement This will provide enough rail length to allow the stair lift to be adjusted so that the floor to seat height will be the same...

Page 5: ...sses inside the two track pieces Step 4 With the plastic rack facing up slide the top rail into the bottom rail and guide them together using the pre installed pins Gently tap the top rail if necessar...

Page 6: ...f the bracket touches the rear of the step The fourth and final bracket should be placed on the last step before the top landing again tightening it so it touches the front of the rear of the last ste...

Page 7: ...l override hole on bottom facing the downhill side of the stairs and gently slide the chassis onto the rail until it makes contact with the plastic rack DO NOT LET THE CHASSIS FREE FALL DOWN THE RAIL...

Page 8: ...lift Step 4 Remove charging strip from the rail box Connect charging strip connector to the charger wire that runs through the center of the rail from the lower charging strips Insert the two 2 charge...

Page 9: ...pending on the closest or most convenient location of a wall power supply Minimize wire length and intrusion E FOOTREST SEAT INSTALLATION Step 1 Remove footrest from box and use the installation switc...

Page 10: ...nnector on the chassis Step 7 Position the keyed seat swivel post in the hole in the seat base hole closest to the top of the stairs Securely tighten the two 2 bolts on the sides of the hold using a 5...

Page 11: ...ight on the armrest control should cycle through a test sequence showing red yellow and green respectively If any of the system controls or safety sensors are engaged the LED indicator light will turn...

Page 12: ...ing is not normally necessary during installation In the event that the remote call send control needs to be re programmed it is essential to program BOTH controls in one programming cycle Do so by co...

Page 13: ...down the rail to ensure that the top of the seat back has at least a 1 2 clearance from the wall and any obstructions CAUTION Do not ride on the chassis or lift until the install is complete B TIGHTE...

Page 14: ...rside of the footrest in both its folded and unfolded positions STEP 5 In each of the above cases the unit should come to an immediate halt The LED indicator light on the armrest control should turn t...

Page 15: ...a 5 64 Allen wrench STEP 4 Move the lift about three 3 feet from either the top or bottom of the rail After 30 seconds the armrest LED indicator light will show orange and beep indicating that the lif...

Page 16: ...installation please inspect and check the box contents Please note that the Pinnacle Parts Box is omitted on new units since these parts are factory installed on the stair lift Report any damage to H...

Page 17: ...he Pinnacle all the way to the top of the stairs so it is out of the way Note that the track brackets install with the round head of the carriage bolts facing the stairs the nuts are toward the wall I...

Page 18: ...arance at the ball of the gas spring STEP 10 Fasten down the near corner of the lower bracket using a drill that has extensions at least ten inches long and a 3 8 socket STEP 11 Measure from the side...

Page 19: ...t STEP 16 Carefully move the fork with your hand don t get pinched To make sure it operates smoothly Watch it go to the floor Make sure both feet sit fully on the floor Make sure the hinge joint is go...

Page 20: ...EQUIRED Wrenches 1 2 deep socket 9 16 open end and 13 mm wrench or socket Allen wrenches 3 16 1 4 and 5 16 Pencil Phillips screwdriver size 2 the medium size_ Optional supplies White lithium grease Sp...

Page 21: ...ball ends straight up to remove Use a 13 mm wrench to remove both ball mounts from the link arm and fork Take both ball ends out and set them aside Leave the jam nuts on them STEP 2 Remove the should...

Page 22: ...the shoulder bolt of the lower bracket STEP 7 Remove the shoulder bolt and jam nut from the lift arm STEP 8 Flip the lift arm over and reinstall the shoulder bolt with its jam nut STEP 9 Use a 1 2 so...

Page 23: ...urn the whole assembly over to allow you to reach the other side STEP 13 Use a pencil to mark where the upper bracket is mounted on the track STEP 14 Use a 9 16 wrench to loosen the two bolts on the u...

Page 24: ...bolt Get it tight ref about 15 ft lbs of torque STEP 20 Position the fork on the other pivot Install the fork pivot shoulder bolt and tighten STEP 21 Position the link arm as shown at right between th...

Page 25: ...tainers into both ends of the gas strut STEP 27 Unfold the rail so it is straight STEP 28 Position bottom bracket so there is about a 1 4 gap between the shoulder bolt and the forward end of the slot...

Page 26: ...de and install the side plate Align and start the Phillips screw and the two large bolts before you tighten any of them STEP 35 Use a 2 Phillips screwdriver to remove the lower safety switch bumper fr...

Page 27: ...Folding Rail Conversion STEP 38 Reinstall the bumper onto the Pinnacle STEP 39 You may now spray the unit with a household cleaner and wipe it clean NO...

Reviews:

Related manuals for Pinnacle SL600