background image

InstallatIon and operatIon Manual for WInd and sun screen sl400

09/12 

|

 3

1. InTroduCTIon

the SL400 is a wind and sun screen. the screen consists of a box with roll-up system, a 
fabric, a pull rod and a supporting system mounted at drop distance from the box. at the 
top, the fabric can be either straight or oblique with a maximum angle of 15° and depending 
on the length of the drop reinforced with boning. this drop can vary from a minimum of 1 
metre up to a maximum of 4 metres.

this manual starts with a step-by-step description of the installation instructions of the 
SL400 for installers. this is followed by information concerning the use and maintenance 
of the screen for the end user. the last pages consist of the handover forms which the 
installer can use to handover the SL400 to the end user.

2. General warnInGs

a number of precautions must be taken for the safe installation, operation and maintenance 
of the sl400. Please take note of the following warnings for the safety of everyone 
concerned!

 

!

please read these instructions carefully before starting with the installation.

 

!

the screen must be fitted or mounted in accordance with local requirements and 
standards. all work must be carried out by a trained and experienced member of 
staff from recognized companies, and never by “do-it-yourself” fitters or apprentices.

 

!

always proceed with caution. ensure that you have a robust footing.

 

!

Make sure there is adequate lighting in the assembly space. remove obstacles and 
dirt. ensure that no other persons except the installers are present. unauthorized 
persons can get in the way or be at risk during the installation.

 

!

there is a lot of tension on the fabric of the wind and sun screen, due to the 
integrated coiled spring located in the fabric roll. always take the necessary care 
when assembling or dismantling the screen.

 

!

the screen must be kept clearly in view at all times during installation and operation. 
persons in the vicinity may be at risk of injury.

 

!

our products must be installed in such a way that all parts remain accessible at 
all times for maintenance and repairs. If this is not the case, Harol cannot be held 
responsible for any additional costs (e.g. demolition work, repairs to exterior or 
interior walls) which may result from this.

the SL400 has been designed for use as a wind and sun screen and as such 
must not be used for all-weather protection. during heavy rain or wind the 
screen must be retracted immediately. 

Summary of Contents for SL400

Page 1: ...Installation Operation Manual Wind and Sun Screen SL400 Art no 49013 sun protection shutters doors...

Page 2: ...A2638 7 4 8 Hooking up the box 7 4 9 Installation of the supporting system 7 4 10 Optional installation of a supporting system for wall or railing assembly A2639 8 4 11 Fine tuning of the handgrip he...

Page 3: ...ted in accordance with local requirements and standards All work must be carried out by a trained and experienced member of staff from recognized companies and never by do it yourself fitters or appre...

Page 4: ...cts we strongly advise you to first fit 1 complete awning before fitting the remaining awnings This will help detect any potential faults early on and enable these to be remedied at the lowest possibl...

Page 5: ...rantee card and the table with tensile forces on screws Screws for installation on the existing mounting surface are not included 4 3 Checking the dimensions Measure the length of the box of the SL400...

Page 6: ...5 Mounting height of the wall brackets The height of the mounting brackets on the wall must match the distance between the brackets on the box of the SL400 The housing of the wind and sun screen must...

Page 7: ...on the box of the SL400 Once again it is very important that the wall consoles are aligned correctly 4 8 Hooking up the box A damping rubber is placed over each wall bracket Next the SL400 can be hois...

Page 8: ...stem can be secured to the wall console with the three bolts supplied Depending on the mounting surface the fitter must choose a particular option for securing the console to the wall The mounting hei...

Page 9: ...in the handgrip In order to be able to carry out this action you must first press down the pin on the button 6 2 Closing the screen To close the screen follow the reverse procedure for opening the scr...

Page 10: ...en Please read this manual carefully before operation or maintenance Installation maintenance and repairs must only be carried out by a qualified and experienced technician Malfunctions which can impa...

Page 11: ...e resulting from improper use 7 4 Maintenance To guarantee trouble free use of the SL400 it is prudent to regularly maintain and inspect the screen at least once a year Check for signs of wear or dama...

Page 12: ...ust the height of the assembly brackets for the box 9 General info on fabrics The fabric collection consists of acrylic fabrics and the Soltis range 86 92 or 96 which can be selected from the collecti...

Page 13: ...38 01 11 fax 32 13 31 48 03 de fabrikant Harol NV vertegenwoordigd door Dhr Jan De Lobel kwaliteitsmanager CE Conformity declaration Relevant EC Directives pertaining to machines 2006 42 EC We Harol...

Page 14: ...ation day month year List of components installed drive unit control and safety devices The technical features and performances of the components listed below are documented in the relevant installati...

Page 15: ...09 12 15 Date Description of work Installation start up adjustments check on safety devices repairs alterations Installer s signature Customer s signature...

Page 16: ...n mounting and mounting surface Rain not permitted permitted under the supervision of the user permitted Danger of frost not permitted The following documents are transfered to the user Manual for the...

Page 17: ...ion mounting and mounting surface Rain not permitted permitted under the supervision of the user permitted Danger of frost not permitted The following documents are transfered to the user Manual for t...

Reviews: