- 11 -
V6-04-05
Assembly instructions Veranda sunblind VZ520
D20. Controle of the right angles:
The awning is now in its lowest position. Screw down the base
supports permanently. The guide rails and the box should stand
at right angles to each other. You can check this by using a large
try square or the 60-80-100 rule as shown in figure. A better,
and much more precise, way is to measure the diagonals of the
separate sections and of the entire construction. The difference
between these diagonals must not be more than 2 mm. Also
make sure that the guide rails run perfectly parallel along their
entire length, so that the tension between the extension profile and the guide rails remains constant.
(No hollow or bulge guide rails)
D21. Adjusting the highest position:
Roll up the sun blind, and stop it by using the fixed switch
at ca 10 à 15 cm. before the blind closes. Check up that the
endprofile runs straight.
Then push the blue button so that also this one lifts up. Let
the motor run a little downwards ( 10 a 15 cm). Then let
the sun blind close completely.
The motor will hum for another few seconds and finally it
will stop. (To catch up possible future elasticity of the fabric).
The final switches for the motors are adjusted that way.
Should it be necessary to readjust the motor, then you can push down again both the buttons. The set-
tings are then erased and you can recommence the adjustments beginning at point 18.
D22. Secure the awning:
Screw the socket-head screws on the square clamps for the lowest supports tightly. The entire system
is now prevented from sliding downwards.
D23. Positioning the plastic U-profile:
Position the plastic U-section underneath the spring inside the endprofile, so that the spring can move
silently in the endprofile. Close the box, and the endprofile. Mount the aluminum covers on to the end
of the guide rails.
D24. Connection and installation of the motor:
Take the electric cable from the motor inside and connect the single-pole switch. If necessary, reverse
the brown and black leads following the signs on the switch.
For the installation of type 3 and 4 we proceed the same way, except in this case we have to use a relay
box if we will be running more than one motor from a single switch. For the connections, see flow
chart R12. The installation of the sun blind has to be done according to the rules.