10 THINGS TO THINK ABOUT BEFORE INSTALLING
HD SYSTEMS
Have you completed a site survey to determine if any site
changes are required?
o
On-line type UPS for Exciter, Audio Processors, Ethernet, STL,
Remote Control, etc
o
AC mains service panel size and OSHA considerations.
o
Remote control capacity and configuration
o
Room
lighting
o
Work
surface
o
Telephone service with headset phone for accessing support.
o
Size
of
building
o
Storage of documents and spare parts
Do you have experience in installation of Transmitters and
Transmission line?
o
Site
grounding
configuration
o
Tools and craft skills to cut and assemble rigid line.
o
Coordinate with electrician to connect AC service to transmitter.
o
Any tower/antenna work considerations/tower crew contacted.
Have you considered the additional heat gain in your building
when adding the HD equipment?
o
Temperature alarm connected to remote control
o
Redundant
cooling
equipment
o
drip pan with drain for split systems to protect equipment below
evaporator
o
Reject loads (if used) location.
o
Addition HVAC may be needed.
Do you own or have access to test equipment to measure and
monitor HD performance?
o
High dynamic range digital spectrum analyzer with averaging and
narrow RBW.
o
HD receiver with split mode
o
Does the site have non-functioning test equipment that needs
removal?