MACH
®
C750-C1050 Outdoor Boilers
5
2 Field Installed Components
2.1 I
NSTALL
P
OWER
C
ORD
S
EAL
(Customer Supplied)
For this OUTDOOR boiler use water proof conduit and sealtight connectors to the boiler. Before starting the
boiler, check to ensure that the proper electrical service is connected to the boiler.
2.2
G
AS
I
NLET
A
SSEMBLY
See Drawing # BP00000218
1.
Remove gas shut-off valve.
2.
Assemble one (1) 1” street 90º elbow (item #1) to
outlet of boiler and assemble gas shut-off valve to the
elbow. This allows clearance for the air inlet stack.
Use approved pipe sealer that resists the action of
Fuel Gases such as Natural Gas or LPG. DO NOT
USE
Teflon™
tape.
See MACH
®
C750-C1050 Installation & Owner’s Manual for specific
electrical requirements and diagrams. Incorrect electrical connections may result in severe injury or
death.
Use water-
proof
conduit &
seal tight
connector
90º street elbow
See MACH
®
C750-C1050
Installation & Owner’s Manual for specific gas connection
requirements and diagrams. Incorrect gas connections may