background image

 

 
 

MACH

®

 C750-C1050 Outdoor Boilers 

 

 
 

 8 

 

MACH

®

 Boiler Size 

Nominal Stack 

Size 

Stainless Adapter for CPVC Vent     

Supplier / Part Number 

C-750,C-900,C-1050 

8" 

Heat-Fab / 9801PKCPVC 

 Stainless Steel Adapter for CPVC Vent  

 

 

 

Use approved high temperature silicone between the adapter and exhaust connections. 

See MACH

®

 C750-C1050 Installation & Owner’s Manual

 

for additional information. 

 

2.6 H

OOD 

A

SSEMBLY 

 

   See Drawing # BP00000218 

   

        

 

 

 

1.  Place hood assembly (ITEM #3) on boiler with 

the stack hole facing the back of the boiler. 

2.  The hood will rest on the 4 angle brackets (inside the hood). 
3.  The 4 rectangular spacers will be on the sides of the cabinet. 
4.  Assemble the exhaust vent and place it through the hood 

then into the exhaust outlet on the boiler. 

5.  There are 4 holes located on the sides of the hood. Insert (4) 

¼” quick release pins (ITEM #2), through the hood into the 
cabinet until the pin is locked in place. 

6.  Secure & seal exhaust venting. See section 2.4 
 

                                                            

 

 

  

When constructing a venting system from CPVC, use only CPVC ASTM 

F441 Schedule 40 pipe & ASTM F439 Schedule 80 fittings. Cement and primer must conform to 
ASTM F493. 
  
Failure to comply may result in failure of venting system. This may cause severe injury or death.  

Position exhaust 
pipe in center of 
hood gasket. 

Summary of Contents for C1050

Page 1: ...co Industrial Patterson Kelley 100 Burson Street East Stroudsburg PA 18301 Telephone 570 476 7261 Toll Free 877 728 5351 Facsimile 570 476 7247 www harscopk com MACH C750 C1050 Outdoor Boilers Rev 1 0...

Page 2: ...ges occurring in connection with the furnishing performance or use of this material TABLE OF CONTENTS MACH C750 C1050 Outdoor Boilers 1 Table of Contents 2 1 BOILER MODIFICATIONS 3 1 1 Completed Outdo...

Page 3: ...omplete the outdoor boiler These additional assemblies are listed in this manual and the MACH C750 C1050 Installation Owner s Manual Be sure to identify your boiler and its specific installation requi...

Page 4: ...l Installing a boiler or vent system using improper installation methods or materials can result in serious injury or death due to fire or asphyxiation from carbon monoxide or other poisonous gases Br...

Page 5: ...90 elbow item 1 to outlet of boiler and assemble gas shut off valve to the elbow This allows clearance for the air inlet stack Use approved pipe sealer that resists the action of Fuel Gases such as Na...

Page 6: ...the assembled inlet pipe over the inlet collar position pipe to be straight and parallel to the back of the boiler and secure using 3 6 x self tapping screws ITEM 8 evenly spaced around the pipe Sili...

Page 7: ...nless venting Below is a table containing the available adapter for each MACH boiler size Installer should use Adapters listed below or equivalent MACH Boiler Size Nominal Stack Size Stainless Adapter...

Page 8: ...on the 4 angle brackets inside the hood 3 The 4 rectangular spacers will be on the sides of the cabinet 4 Assemble the exhaust vent and place it through the hood then into the exhaust outlet on the b...

Page 9: ...section can be raised and placed behind the angle supports slowly lower the hood until it is supported by the top section For further instructions on installation see MACH C750 C1050 Installation Owne...

Page 10: ...ecirculation into the air inlet Flue gas recirculation indicates that the vent is not installed properly for local conditions 2 Check for freezing of the condensate lines Frozen lines will result in b...

Page 11: ...MACH C750 C1050 Outdoor Boilers 11 4 Assembly Drawing 4 1 ASSEMBLY DRAWING...

Page 12: ...2007 Harsco Corporation Printed 3 18 2011...

Reviews: