background image

MACH

®

 Gas-Fired Boiler 

Dual Fuel (NG & LP) MACH Boiler Supplement                  

 

 

 6 

2.2 F

UEL 

S

ELECTION 

 

 

1.  Before switching fuels, ensure that the boiler is turned off.   
2.  Ensure that both fuel lines are correctly connected to the boiler. 
3.  Make sure the ball valve for the desired fuel is open.   
4.  Use the fuel selector switch, located inside the left control panel door near the top of the boiler, to select the 

desired fuel.  The fuel selector switch has three positions: propane, off and natural gas. 

 

NOTICE!

  The dual fuel selector switch is a hesitation type switch.  When switching fuels you 

must

 

release the switch in the “OFF” position before switching to the other fuel. 

 
5.  Start the boiler according to the MACH® C750-C1050 Installation & Owner’s Manual (latest edition) 

 

NOTICE!

  It is recommended to close the ball valve of the non-selected fuel.    

 

FUEL SELECTOR SWITCH 

 

 

                                    

2.3 G

AS 

V

ALVE 

A

DJUSTMENT 

 

 
Open front door on the right side of the boiler.  The two gas valves are located inside the cabinet on the left.  Each 
valve is labeled and adjusted for a specific fuel. The upper gas valve is for natural gas (NG).  The lower gas valve is 
for propane (LP).  Check the combustion using a combustion analyzer and adjust the fuel/air ratio of the valve being 
used according to the procedures outlined in the latest edition of the MACH® C750-C1050 Installation & Owner’s 
Manual. 
 
 

Summary of Contents for MACH C-750GG

Page 1: ...__ Start Up Date ____________________ Harsco Industrial Patterson Kelley 100 Burson Street East Stroudsburg PA 18301 Telephone 570 476 7261 Facsimile 570 476 7247 www harscopk com OW MACH Dual Fuel Re...

Page 2: ...MACH Gas Fired Boiler Dual Fuel NG LP MACH Boiler Supplement 2...

Page 3: ...9 2 7 Electrical Logic Drawing MACH C 750GG C 900GG C 1050GG 10 2 8 Electrical Layout Drawing MACH C 750GG C 900GG C 1050GG 11 3 0 LIMITED WARRANTY 12 NOTICE The information contained in this documen...

Page 4: ...FUEL BOILERS 2 1 GAS INPUT CONNECTIONS The MACH dual fuel boiler is equipped with dedicated connections for each fuel The natural gas NG connection is a 1 1 4 ball valve The propane LP connection is a...

Page 5: ...MACH Gas Fired Boiler Dual Fuel NG LP MACH Boiler Supplement 5 GAS INPUT CONNECTIONS PROPANE 1 NATURAL GAS 1...

Page 6: ...you must release the switch in the OFF position before switching to the other fuel 5 Start the boiler according to the MACH C750 C1050 Installation Owner s Manual latest edition NOTICE It is recommend...

Page 7: ...test edition of the MACH C750 C1050 Installation and Owner s Manual Service and Maintenance on these units must only be performed by knowledgeable and experienced personnel familiar with its operation...

Page 8: ...when there is excessive manifold gas pressure for the proper operation of the boiler In addition a high gas pressure error could be due to both gas valves being open There are LED indicators on each g...

Page 9: ...C 900GG C 1050GG Mark Description 1 Burner Transition Piece 2 Blower 3 Venturi 4 Pilot Gas Tube LP or NG 5 High Gas Pressure Switch LP and or NG 6 NG Pilot Gas Tube 7 NG Automatic Gas Valve 8 NG Low...

Page 10: ...MACH Gas Fired Boiler Dual Fuel NG LP MACH Boiler Supplement 10 2 7 ELECTRICAL LOGIC DRAWING MACH C 750GG C 900GG C 1050GG...

Page 11: ...MACH Gas Fired Boiler Dual Fuel NG LP MACH Boiler Supplement 11 2 8 ELECTRICAL LAYOUT DRAWING MACH C 750GG C 900GG C 1050GG...

Page 12: ...H Gas Fired Boiler Dual Fuel NG LP MACH Boiler Supplement 12 3 0 LIMITED WARRANTY Warranty information may by found in the latest edition of the MACH Installation and Owner s Manual for each unit seri...

Reviews: