Step 4 - Insert square nuts into cross bars
Parts
2 x side cross bar 45cm
2 x square nut
Insert a square nut into the inside channel of each
cross bar that will go on the
le
side of the
greenhouse.
The inside channel is the one opposite the closed
face.
These nuts are for irrigation parts which you may or
may not add in the future.
Step 5 - Insert the side panels and side cross bars
The
upper le side panel
has a hole with grommets in it for an external hose or tank connection,
if you have a solar, 3-season or 4-season model.
Parts:
4 x clear side panel
4 x side cross bar 45cm, two with nuts
Peel the protective plastic off
both sides
of two
side panels, remembering which side had the
white film.
The side with the white film should face
outside; it is the UV treated side.
Insert the bottom two clear side panels.
Slide a bar with nut over the le panel.
Slide a bar without nut over the right panel.
Tighten the screws.
Finish inserting all the side panels and cross
bars in the same way.