Haskris Model R1600 Full Load System Check
Copyright © 2011 Haskris Company
42
www.haskris.com
Version R1600-X-R407C-XXX Instruction Manual Rev00
Full Load Syste
Full Load Syste
Full Load Syste
Full Load System Checklist for Haskris R16
m Checklist for Haskris R16
m Checklist for Haskris R16
m Checklist for Haskris R1600, S/N HB
00, S/N HB
00, S/N HB
00, S/N HB ____________
____________
____________
____________
Haskris WW4
Haskris WW4
Haskris WW4
Haskris WW4, S/N HB
, S/N HB
, S/N HB
, S/N HB__________ (Located in Equipment Room)
__________ (Located in Equipment Room)
__________ (Located in Equipment Room)
__________ (Located in Equipment Room)
Project Name ______________________________ Location ___________________________________
Note:
Note:
Note:
Note: Checklist to be completed by Haskris Approved Service Agent.
Directions:
Directions:
Directions:
Directions:
Fax both pages of completed checklist to Haskris (Fax#: 847-956-6595)
Pre Full Load
Pre Full Load
Pre Full Load
Pre Full Load Checklist:
Checklist:
Checklist:
Checklist:
___
No Refrigeration Service Contactor labels have been affixed to the interior or exterior of the R1600.
___
Confirm compressor crankcase heater has been energized for a minimum of 12 hours. (See Section 3.1)
___ Confirm 1-1/2” reinforced opaque hose between connected to WW4.
___ Reservoir is at tank full level.
___ Glycol solution % (Record actual measurement here).
___ Glycol solution pH level (Record actual measurement here).
___ Confirm all isolation valves are open and all flush valves are closed.
Note:
Note:
Note:
Note: If any of the above items are found to be deficiencies, DO NOT CONTINUE WITH FULL LOAD
SYSTEM CHECK and notify Haskris immediately. Installer will issue a Credit Card Purchase Order to Haskris
Start-Up Agent if any items are found incomplete and resulting in delay of system start-up. If no deficiencies
are found, continue with Full Load System Check below.