Haskris Model R1600 Preventative Maintenance (PM)
Copyright © 2011 Haskris Company
46
www.haskris.com
Version R1600-X-R407C-XXX Instruction Manual Rev00
14.
14.
14.
14.
Complete PM Data Log Sheet.
Complete PM Data Log Sheet.
Complete PM Data Log Sheet.
Complete PM Data Log Sheet.
FOLLOWING ITEMS TO BE PERFORMED BY A HASKRIS AUTHORIZED
REPRESENTATIVE AT A MINIMUM OF ONCE A YEAR, BEGINNING ONE
YEAR AFTER DATE OF INSTALL.
15.
Clean Blow-off Wye Strainer per Section 5.2
16.
Perform complete system glycol change per Section 5.1.4 (Tank and Piping).
17.
Tighten all electrical terminal connections.
PM System Check for Haskris
PM System Check for Haskris
PM System Check for Haskris
PM System Check for Haskris R1600
R1600
R1600
R1600, S/N HB
, S/N HB
, S/N HB
, S/N HB
__________________________
__________________________
__________________________
__________________________
!!!!