background image

No.:GC-JS-21                Version: 01/00                    

Effective date

2020-03-30

 

 

  

26 

 

7.11 Door opening treatment in special cases  

 If the door cannot be opened due to equipment failure (such as E05 alarm), and the load in the equipment needs to 

be taken out, follow the steps below:  

To  ensure  safety,  you  must  first  cut  off  the  power  and  ensure  that  the  pressure  in  the  sterilization  chamber  is 

completely released.  

Use  a  tool  to  open  the  safety  valve  to  completely  release  the  air  pressure.  Be  careful  not  to  get  burned  by  the 

discharged water vapor. Can be operated with insulated gloves

  

1

 

Power on

  

2

 

Open the door  

 When opening the door under special circumstances, please ensure that the sterilizer is powered off and  

the pressure in the sterilization chamber has been completely released.  

  

7.12  Review or slap of internal records  

 The device can store 20 recent operation records and print again. When the printing paper is out of paper, you don't 

need to worry about using the lack of sterilization records. Just replace the printing paper and follow the steps below 
to make up the sterilization records.

  

1

 

Press the "Record" button on “more” pages to enter

  

  

The record name consists of three parts: program name + count + start time, the user can select the record to be 

viewed or swat according to the record name.  

2)  Press the corresponding record name to enter the corresponding record details interface

  

 Press the print key to make up this record

  

7.13 Handling when not in use for a long time  

 If users need to use the equipment for a long time (greater than or equal to 4 days), please follow the steps below 

to handle the equipment

  

Summary of Contents for A50B

Page 1: ...No GC JS 21 Version 01 00 Effective date 2020 03 30 HATCH GROUP INC Pressure Steam Sterilizer Autoclave A50B 3L Operation Manual V1 0...

Page 2: ...allation 11 4 Adjusting 15 5 Introduction of preset programs 15 6 User interface description 17 7 Instructions of operation 23 8 Errors list 28 9 Maintenance 31 10 Quality assurance 37 11 Accessories...

Page 3: ...is manual carefully before using the equipment be familiar with the operation and safety instructions of the equipment Do not use instruction that is not from the manufacturer for reference We reserve...

Page 4: ...ling If an emergency is found it shall be handled as follows Turn off the power switch Unplug Product responsibilities Without the written permission of the manufacturer it shall not be modified or us...

Page 5: ...zer to sterilize items which contains chloride ions you must rinse the sterilization chamber with clean water after each cycle to prevent the deposited chloride ions from corroding the pot and extendi...

Page 6: ...contact the manufacturer A three hole socket 220 22VAC 16A 50Hz must be used to ensure that the socket is reliably grounded Do not place the device where it is difficult to disconnect the power Do no...

Page 7: ...agnetic compatibility GB T 18268 standard 1 2 Product structure This product mainly consists of sterilization chamber sterilization chamber door and seal ring steam generator condenser and fan vacuum...

Page 8: ...121 and 124 and the temperature difference between each point in the sterilization chamber at the same time is no more than 2 and the maintenance time is 20min 1 5 Visual section of the device 1 Touc...

Page 9: ...erature 137 Max working pressure 0 24MPa Safety valve set pressure 0 24MPa Safety valve open pressure 0 24MPa 0 26MPa Capacity of clean water tank 1L Capacity of waste water tank 0 8L Power input 220V...

Page 10: ...L 0 005mg L 0 05mg L 0 1mg L Chloride Phosphate Conductivity PH value Conductivity hardness 2mg L 0 5mg L 15uS cm 5 7 5 Colorless clean without precipitation 0 02mmol L 2 5 Transportation and storage...

Page 11: ...er it meets the requirements according to the following clauses 3 2 1 Power requirements AC220V 50Hz unidirectional power supply voltage fluctuation does not exceed 10 power 3 5kVA 3 2 2 Environmental...

Page 12: ...ich the sterilizer is placed is strong enough do not block the vent of the sterilizer 3 3 Handling of packaged products To ensure safe handling please use a cart and similar tools to move the device I...

Page 13: ...t of the product it is placed on the workbench Please note the following when handling It is strictly forbidden to lift the door during transportation to avoid damage to the device Do not lift the foo...

Page 14: ...justed to make the sterilizer roughly flat 3 7 Insert the power plug into the socket Make sure that the equipment is reliably grounded 3 8 Other considerations After the device has been transported an...

Page 15: ...pipelines to ensure that the cold air in the sterilization chamber is eliminated This device comes with a leak test program the program is vacuum test Run this program in the cold state After the tes...

Page 16: ...rying Dry the load when it is not dry after sterilization 5 2 2 Applicable maximum load table Model Maximum weight of instruments Maximum weight of fabric loads A50B 2 2kg 0 5kg package 5 3 Maximum wo...

Page 17: ...and time Save Settings Show the current number of cycles 6 1 2 Home Page Display the current temperature in the sterilization chamber Display the current pressure in Shows the quality of the water Sh...

Page 18: ...34 universal quick 134 solid 121 universal 1 dry program dry 2 test programs Vacuum test to check the leakage of machine B D helix test to check the effectiveness of program Remarks For preset paramet...

Page 19: ...gly 6 1 4 4 The user sets whether the power on preheating function is turned on or off After entering the page is like this When set to On The equipment will start to warm up and keep warm after being...

Page 20: ...er can set whether to enter with a password when starting up and set the entry password Press the Enable button to set whether this function is enabled Enable This function is turned on and you need t...

Page 21: ...nk The waste water tank is full and needs to be emptied 3 Door open Need to close the door before running the program 4 Bad water quality The water in the water storage tank is unqualified it needs to...

Page 22: ...al has reached the end of its life and needs to be replaced 10 Need maintenance The periodic maintenance time has expired and the manufacturer or manufacturer s representative is required to maintain...

Page 23: ...tion when loading the instruments 1 The load is forbidden to contact the chamber wall and there should be a gap between the sterilization packages to facilitate the penetration of steam 2 Distortion o...

Page 24: ...he sterilization of moisture and heat resistant medical devices not for the sterilization of oils and powders such as petroleum jelly and agar This sterilizer cannot be used for sterilization of liqui...

Page 25: ...oves or other tools to remove the sterilized items to avoid burns If the sterilized items are taken out immediately after the procedure there may be a small amount of condensate on the sterilized item...

Page 26: ...ure in the sterilization chamber has been completely released 7 12 Review or slap of internal records The device can store 20 recent operation records and print again When the printing paper is out of...

Page 27: ...3 30 27 1 1 Drain the water from the water storage tank and waste water tank 2 2 Disconnect the power supply 3 3 Store the equipment to avoid the indoor environment of high temperature and high humidi...

Page 28: ...The temperature in sterilization chamber 150 temperature sensor in the sterilization chamber damaged Check the temperature sensor in sterilization chamber 2 E32 Heating ring temperature 220 heating ja...

Page 29: ...acuum selection valve 11 E41 After 8 minutes in the preheating phase the temperature of the heating jacket 100 heating jacket failed Check the thermostat of heating jacket and the related thermostat 1...

Page 30: ...of the program Door lock is open during operation 1 The electronic lock is stuck and damaged 2 The circuit board is damaged Check the electronic lock and circuit board 20 E12 When running the general...

Page 31: ...user are 1 Air filter 2 Door sealing ring 3 Safety valve 4 Power cord 5 Other internal accessories 9 2 Maintenance plan 9 2 1 Cleaning plan No Cleaning items Cycle Requirement Remark 1 Sterilization...

Page 32: ...hamber wall and sealing surface with a clean towel dipped in water Do not use acidic or alkaline cleaning agents to clean the sterilization chamber Before cleaning the sterilization chamber please con...

Page 33: ...am 2 Wait until the pressure is near 100kpa pull the pull ring on the safety valve to make it open wait for about 1s there will be air and steam exhausted indicating that the safety valve can be opene...

Page 34: ...n the empty pot to see if the result is qualified If it fails please contact the supplier or supplier representative The test results may be inaccurate when the sterilization room is hot or not dry an...

Page 35: ...ugh the paper outlet Note that the scratched side is facing outward Close the paper hatch and reset the rotating handle Press the indicator light and observe whether the paper runs smoothly If you fin...

Page 36: ...No GC JS 21 Version 01 00 Effective date 2020 03 30 36...

Page 37: ...or damage caused by accidental drop or collision 3 Failure or damage caused by self installation and repair 4 Failure to show purchase invoice and warranty card 5 Damaged by external reasons such as a...

Page 38: ...qualified Solid load Formal inspection qualified Small amount of porous permeable strips Formal inspection qualified Small amount of porous permeability load Formal inspection qualified Fully porous p...

Page 39: ...ISE 15 56 24 221 133 7 01 15 STER START 15 56 24 221 133 7 01 15 MAX TEMP 136 1 MIN TEMP 133 7 During sterilization MAX PRESS 227 phase MIN PRESS 207 STER END 16 00 24 213 134 6 04 00 DRY END 16 04 58...

Page 40: ...Air is injected into the sterilization chamber through the bacteria filter to balance the pressure of the sterilization chamber with the external atmospheric pressure 9 End The running program has end...

Reviews: