The LEFT barrier is shown in the diagram above.
ASSEMBLY AND ADJUSTMENT
REQUIRED TOOLS:
- set of keys
- set of screwdrivers
- drill
CORDS:
- power cord 1,5mm
2
- signal cord 0,5mm
2
FOUNDATION
:
When the foundation is poured under the barrier, a PVC pipe should be placed in it (min. 12mm
diameter). This way we can secure the cords brought to the barrier in front of the mechanical
device. Diagram above. Power and signal cord should always be separated.
Summary of Contents for 535Y
Page 1: ...HATO 535Y AUTOMATIC BARRIER OPERATING MANUAL...
Page 6: ......
Page 23: ...NOTES...
Page 26: ......