A
B
C
D
E
F
G
H
I
41
4000327280
E09.16
USA / GB
HA120PX
C
- Pre-operation inspection
3 - Inspection and Functional test
3.1 -
DAILY INSPECTION
Each day before the beginning of a new work session and with each change of operator, the machine
must be subjected to a visual inspection and a complete functional test.
In case of loose fasteners, refer to torque table value in maintenance book.
In case of leaks, replace the damaged part before use.
In case of structural part deformation, cracks, broken weld, paint chips, replace the part before use.
Sample of broken welds
Inspection Forms are provided to assist your inspection process.
We recommend these forms to be completed daily and stored to assist with your maintenance
schedule.
Each action is depicted in the daily inspection sheet using the following symbols.
• Never use a defective or a malfunctioning aerial work platform.
• If any item on the check list is marked "No" during the inspection; machine must be tagged and placed
out of service.
• Do not operate the machine until all identified items are corrected and it has been declared safe for
operation.
Visual inspection without
disassembly
Lubrication-Grease
Functional adjustments
Drain
Test and validate
Tighten
Check levels
Systematic replacement
Visual inspection with small
disassembly or movement
needed to reach the part.
Replacement is necessary.
Proof tests : Need HAULOTTE Services® authorization. For countries
where machines are not subject to controlled periodic maintenance.
Summary of Contents for HA120PX
Page 1: ...Operator s manual HA120PX 4000327280 E09 16 USA GB Operator s manual HA120PX ...
Page 2: ...2 4000327280 E09 16 USA GB HA120PX ...
Page 6: ...6 Operator s manual ...
Page 38: ...38 4000327280 E09 16 USA GB HA120PX B Familiarization Notes ...
Page 70: ...70 4000327280 E09 16 USA GB HA120PX D Operation instructions Notes ...
Page 84: ...84 4000327280 E09 16 USA GB HA120PX E General Specifications Notes ...
Page 90: ...90 4000327280 E09 16 USA GB HA120PX F Maintenance Notes ...