101
4000392130
E03.16 USA
/
GB
Control
Generator option (For HT132RTJ PRO only)
E041
15 mn
Control
Generator option (For HT132RTJ PRO only)
1 - You will need
2 - Preliminary procedure
1.
Place the machine in maintenance configuration.
3.3.1-Placing the machine in maintenance
configuration
N.B.
-:-The generator's performances are linked to the hydraulic oil temperature. Ensure that the
hydraulic oil temperature is between 30 °C(86 °F) and 70 °C(158 °F) during the operations.
3 - Power supply voltage control
• Disconnect all equipment connected to the generator (welder, hand equipment, ...).
• Start up the machine.
• Start the generator.
• Wait for the generator to stabilize.
• Measure the voltage at the welder outlet using a multimeter.
N.B.
-:-The voltage between each phase must be between 210 V AC and 240 V AC.
• Measure the voltage at the 110 V outlet.
N.B.
-:-The voltage at each outlet must be between 110 V AC and 135 V AC.
• Standard tool kit
• Multimeter
• Protective goggles
• Gloves
• Place barriers around the perimeter of the
work area
If a malfunction occurs, contact HAULOTTE Services®.
Summary of Contents for HT132RTJ PRO
Page 2: ...2 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO ...
Page 6: ...6 Maintenance book ...
Page 16: ...16 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO A Safety precautions Notes ...
Page 60: ...60 4000392130 E03 16 USA GB Control Oil change Wheel reducer E002 15 mn Notes ...
Page 62: ...62 4000392130 E03 16 USA GB Replacement Hydraulic filter cartridge E003 15 min Notes ...
Page 64: ...64 4000392130 E03 16 USA GB Filling up Oil change Fuel tank E004 15 mn Notes ...
Page 72: ...72 4000392130 E03 16 USA GB Replacement Tightening Wheel E006 15 min Notes ...
Page 74: ...74 4000392130 E03 16 USA GB Tightening Screws bolts and nuts E007 15 min Notes ...
Page 76: ...76 4000392130 E03 16 USA GB Control Oil change Turntable rotation gearbox E008 15 mn Notes ...
Page 82: ...82 4000392130 E03 16 USA GB Control Lubrication Chains E016 Notes ...
Page 98: ...98 4000392130 E03 16 USA GB Control Filling up Battery charge Battery E018 10 min Notes ...
Page 100: ...100 4000392130 E03 16 USA GB Lubrication Telescope E022 15 mn Notes ...
Page 104: ...104 4000392130 E03 16 USA GB Control Cable carrier cat track E048 30 min Notes ...
Page 108: ...108 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO D Diagnosis assistance Notes ...
Page 122: ...122 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO E Electric circuit Notes ...
Page 132: ...2 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 2 ENGINE UNIT II ...
Page 133: ...3 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 3 TURRET UNIT ...
Page 134: ...4 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 135: ...5 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 136: ...6 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 137: ...7 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 4 FRAME UNIT ...
Page 138: ...8 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 5 BASKET UNIT ...
Page 139: ...9 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 141: ...11 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 7 NEW ARCHITECTURE ...
Page 142: ...12 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 143: ...1 Hydraulic diagram HT43RTJ PRO HT132RTJ PRO 1 HT43RTJ PRO HT132RTJ PRO 1 1 FOLIO 1 1 ...
Page 144: ...2 Hydraulic diagram HT43RTJ PRO HT132RTJ PRO ...