1-6
I
nstallatIon
P/N 0387183_V
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
NOTE:
B
egin
lineup
leveling
from
the
high
-
est
point
of
the
store
floor
.
Place shims under the rail and make sure that they
are positioned at a base component (crossbar).
This transfers the weight directly from the loaded
case through to the floor.
Placing shims at other locations will cause uneven
distribution of weight leading to piping leaks, as
well as sagging or wracked doors.
Bottom front supports must be shimmed if not in
full contact with the floor.
Front
Back
Base Component
Shim Here
Shim Here
Shim Here
Permit Number:
20-05195
Summary of Contents for RFLNS
Page 2: ...Permit Number 20 05195 ...
Page 6: ...Permit Number 20 05195 ...
Page 32: ...Permit Number 20 05195 ...