1-10
I
nstallatIon
P/N 0387183_V
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
2
Locate and remove the shipping block in the
center of the heat exchanger in the interior
bottom of each case, see Figure 2.
Snap a chalk line on the floor to use as a guide
for positioning the front of the cases in the
line-up. The front base frame should be on the
chalk line.
3
Once cases are close to final placement, remove
the shipping braces from the ends to be joined,
see Figure 3. Discard bolts and flat washers
used to hold shipping braces. Bolts are too
long to be used for joining.
RMN
Figure 3. Remove Shipping Braces
D
o
not
use
shipping
bolts
to
join
cases
!
Shipping Brace
Figure 2. Remove Shipping Block
(One From Each Side of Island Models)
Shipping
Block
RLNI / RLNI
Permit Number:
20-05195
Summary of Contents for RFLNS
Page 2: ...Permit Number 20 05195 ...
Page 6: ...Permit Number 20 05195 ...
Page 32: ...Permit Number 20 05195 ...