23
2 1 0 0 B A L E B U S T E R
O P E R A T I N G I N S T R U C T I O N S
Figure 3.4
Bale loading sequence
7.
Disconnect the tractor lift arms from the 2100 BALEBUSTER.
8.
Drive the tractor slowly away from the 2100 BALEBUSTER.
6.
Disconnect the PTO from the tractor, and place the front half of the shaft into the bracket located on the
front of the 2100 BALEBUSTER.
3.2.6 Loading bales into the 2100 BALEBUSTER
To load bales into the 2100 BALEBUSTER, perform the following steps:
NOTE:
The loading area should be flat and level.
1.
Position the 2100 BALEBUSTER ahead and to the side of the bale. Extend the hydraulic cylinder,
lowering the loading tines until they are on the ground.
2.
Back up slowly, while centering the bale between the tines. Back up until the loader frame touches the
front of the bale.
3.
Retract the hydraulic cylinder slowly. The bale will roll into the shredding chamber.
4.
Once the cylinder is completely retracted, the 2100 BALEBUSTER is ready to shred the bale.
1
2
3
4
Summary of Contents for 2100 BALEBUSTER
Page 2: ...A Tradition of Innovation Since 1966...
Page 4: ...A Tradition of Innovation Since 1966...
Page 56: ...48 2 1 0 0 B A L E B U S T E R P A R T S R E F E R E N C E R O T O R A S S E M B L Y...
Page 62: ...54 2 1 0 0 B A L E B U S T E R P A R T S R E F E R E N C E B A L E L O A D E R A S S E M B L Y...
Page 74: ...66 2 1 0 0 B A L E B U S T E R P A R T S R E F E R E N C E O R B I T M O T O R...
Page 76: ...68 2 1 0 0 B A L E B U S T E R P A R T S R E F E R E N C E W H E E L A N D B E A R I N G...