HAYWARD GORDON LTD
Page
17
Rev:
1
HRF Series Mixers
Date 11/99
Section: RF
d. If, after this initial run-in period, the leakage is still excessive, adjust the gland by tightening the
nuts evenly one flat or a sixth of a turn at a time. This should be done every 30 minutes until
leakage is reduced to a normal level.
e. Adjustments must always be done gradually and held to a minimum tightness. This procedure
may take several hours, but will pay dividends in increased packing and shaft life.
STUFFING BOX, HIGH PRESSURE 0-150 PSI
PART
NO.
DESCRIPTION
1
STUFFING BOX FLANGE ASSEMBLY * +
2
GLAND PLATE *
3
PACKING GLAND *
4
STUD
5
NUT
6
PACKING RINGS *
7
LANTERN RING *
8
RELIEVE PLUG
9
GREASE FITTING
* For Material type refer to unit assembly drawing.
+Mounting flange is ANSI raised face on alloy units only. Steel units are ANSI flat face.