RSCC
10
A3018-3.2 en/de/fr
HBM
5
Mechanical installation
5.1 Mounting instructions
When mounting the load cells, consider the following factors:
The load cell must be handled carefully
The load cell must not be overloaded, not even briefly
Each load cell must be bridged with a copper wire either during or directly
after installation to prevent welding currents flowing over the load cell
Important
The cable fastening side of the transducer should always be connected
directly with the rigid customer
‐side
force transfer areas. Ensure that the cable
is laid so that, where possible, no force shunt is caused by the cable (e.g.
through the weight or stiffness of the cable).
Rigid
force transfer
Rigid
force transfer
correct
incorrect
Fig. 5.1:
Transducer orientation during installation
NOTE
Please note the maximum permissible load-carrying capacity of the loading
fittings and of the tension/compression bars, screws and knuckle eyes.
Summary of Contents for 1-U1R/200KG/ZGW
Page 2: ...English Page 3 20 Deutsch Seite 21 38 Fran ais Page 39 53...
Page 58: ...RSCC 58 A3018 3 2 en de fr HBM...
Page 59: ......