Mechanical installation
PW28
A05384_01_Y00_00
HBM: public
7
4
Mechanical installation
4.1
Important precautions during installation
S
Handle the transducer with care.
S
Welding currents must not be allowed to flow through the transducer. If
there is a risk that this might happen, you must use a suitable low-ohm
connection to electrically bypass the transducer. HBM provides the highly
flexible EEK ground cable for this purpose, for example. It can be screwed
on above and below the transducer.
S
Make sure that the transducer cannot be overloaded.
WARNING
There is a danger of the transducer breaking if it is overloaded. This can cause
danger for the operating personnel of the system in which the transducer is
installed.
Implement appropriate safety measures to avoid overloads or to protect
against the resulting dangers.
Notice
Load cells are precision measuring elements and need to be handled carefully.
Dropping or knocking the transducer may cause permanent damage. Make
sure that the transducer cannot be overloaded, including while it is being
mounted.
Summary of Contents for PW28
Page 1: ...Instructions for use Gebrauchsanleitung Mode d emploi English Deutsch Fran ais PW28...
Page 3: ...Instructions for use Gebrauchsanleitung Mode d emploi English Deutsch Fran ais PW28...
Page 16: ...Dimensions 14 A05384_01_Y00_00 HBM public PW28...
Page 17: ...Instructions for use Gebrauchsanleitung Mode d emploi English Deutsch Fran ais PW28...
Page 29: ...Abmessungen PW28 A05384_01_Y00_00 HBM public 13 8 Abmessungen Abmessungen in mm...
Page 30: ...Abmessungen 14 A05384_01_Y00_00 HBM public PW28...
Page 31: ...Instructions for use Gebrauchsanleitung Mode d emploi English Deutsch Fran ais PW28...