14
U3
HBM 11.12.2000
5.3.3 Installation with two knuckle eyes
H
M2 (M
A
)
M
B
M
B
M1 (M
A
)
base
flange
Fig. 5.5
Installation for tensile loading with two knuckle eyes
Nominal
force (kN)
H(mm)
Starting torque M
A
(Nm)
Starting torque M
B
(Nm)
Screws for adapter
mounting
M1
M2
0.5 – 10
153
5
60
M5x12
M5x16
20
232
40
300
M10x25
M10x30
50
256
40
500
M10x25
M10x30
100
300
94
1000
M10x25
M10x30
Attaching the knuckle eye:
•
Screw the correct adapter (dependent on nominal force!) to the U3 (please
note screw length)
•
Turn the lock nut back as far as the eye
•
Screw the knuckle eye into the adapter as far as the stop
ATTENTION
Do not apply force to the transducer flange.
•
Unscrew knuckle eye 1 to 2 turns and align
•
Load eye with nominal load
•
Tighten lock nut (M
B
, lock using the flat of the adapter)
ATTENTION
When locking with the lock nut, under no circumstances let the
torque be transmitted through the transducer.
SUNSTAR传感与控制 http://www.sensor-ic.com/ TEL:0755-83376549 FAX:0755-83376182 E-MAIL:szss20@163.com
SUNSTAR自动化 http://www.sensor-ic.com/ TEL: 0755-83376489 FAX:0755-83376182 E-MAIL:szss20@163.com