10
VKK14 / VKK1
R
4
A23261.0 en/de/fr
H
BM
3
P
r
epa
r
ing the cables
For optimum results, proceed as follo
w
s:
D
R
emo
v
e the outer sheath of the cable and depending on the cable
diameter, expose the braided screen for about 8 ... 15 mm.
D
Push the cap nut and the bladed insert
w
ith the sealing ring onto the cable.
D
Bend the braided screen out
w
ard at right angles (90
°
).
D
Crimp the braided screen o
v
er to
w
ards the outer sheath of the cable, i.e.
fold it a further 180
°
.
D
Slip the intermediate connection piece on as far as the braided screen,
quickly turning it to and fro around the cable axis.
D
Push the bladed insert
w
ith the sealing ring into the intermediate connection
piece and engage the locking element.
D
Firmly tighten the cap nut
shielded cable
cap nut
sealing ring
bladed insert
braided screen
intermediate connection
Fig.3.1:
P
r
epa
r
ing a connection cable