7 Cleaning and servicing the heating system – Requirements
160
I
NSPECTING
AND
CLEANING
THE
FLUE
PIPE
1.
Set the control to the operating mode
OFF
.
✓
The
OFF
symbol lights up.
2.
Allow the fire in the heating system to burn out and cool down.
3.
Turn the main switch off.
8.
Fasten the inspection hatch cover firmly on the flue pipe with the
wing nut.
9.
Switch the heating system on again.
✎
See the chapter entitled “6 Using the heating system”, section
“6.2 Switching on the heating system”.
✓
The cleaning of the flue pipe is completed.
C
HECKING
AND
CLEANING
THE
ASH
REMOVAL
SYSTEM
1.
Set the control to the operating mode
OFF
.
✓
The
OFF
symbol lights up.
2.
Allow the fire in the heating system to burn out and cool down.
Important!
✎
See “Generally applicable safety instructions” in this section.
Caution!
Danger of burns from hot surfaces
The surface of the flue pipe becomes very hot during operation.
Even when turned off, it only cools down slowly.
Switch the heating system off and only start with the cleaning and
maintenance work when the surfaces have cooled down.
4.
Unscrew the wing nut (1) on
the inspection hatch cover (2).
5.
Remove the inspection hatch
cover (2) from the flue pipe
(3).
6.
Check whether the flue gas
pipe (3) needs cleaning.
7.
If necessary, suction the ash
out of the flue pipe using a va-
cuum cleaner (3).
Figure 7/17 - Cleaning the flue gas pipe
1
2
3
Important!
✎
See “Generally applicable safety instructions” in this section.
Summary of Contents for Compact 25
Page 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Page 2: ......
Page 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Page 187: ......