7 Cleaning and servicing the heating system – Requirements
166
4.
Open the access hatch.
5.
Inspect the fuel bunker for the burning of unsuitable residues or
foreign bodies and remove these if necessary.
6.
Close the access hatch.
7.
Turn the main switch on.
✓
The control is activated.
8.
Set the desired operating mode.
✓
The inspection of the fuel bunker is completed.
Summary of Contents for Compact 25
Page 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Page 2: ......
Page 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Page 187: ......