4 Planning and installation – Installing the heating system
55
A
TTACHING
THE
PRESSURE
EQUALISATION
HOSE
18.
Place the rubber seal on the feed side connections of the pressure
equalisation hose (1).
19.
Attach the pressure equalisation hose (1) to the connection
bushing of the feeding system (2) using a pipe wrench.
✓
The pressure equalisation hose is connected on the feed side.
C
ONNECTING
THE
FEEDING
SYSTEM
20.
Insert the feeding system cable through the opening provided for
it on the cladding.
21.
Connect the plug of the feeding system to the drive module.
✎
See “Electrical plans HDG Compact 25 - 80”.
✓
The feeding system and the pressure equalisation hose are now
installed.
I
NSTALLING
THE
CLADDING
HDG C
OMPACT
25/35
D
ISMANTLING
THE
FLUE
GAS
TEMPERATURE
SENSOR
AND
LAMBDA
SENSOR
The pressure equalisation hose is only available with the
HDG Compact 45/50/65/80 boiler.
Figure 4/30 - Attaching the pressure equalisation hose
2
1
The pressure equalisation hose can only be installed once the clad-
ding has been installed.
The cladding packets are numbered chronologically. The number
also corresponds to the order in which the cladding part is needed.
Figure 4/31 - Dismantling the flue gas temperature sensor and lambda sensor
2
1
3
4