4 Planning and installation – Installing the heating system
63
I
NSTALLING
THE
FRONT
CLADDING
2.
Open cladding packet “1A”.
1.
Screw the two front claddings (1 + 2) together using the M6 hex-
agon socket screws (size 4).
2.
Fasten the front cladding (3) to the boiler with the M10 (size 17) (2)
nuts and M10 washers.
3.
Insert the cover plate (4) for the level indicator in the front clad-
ding (3).
4.
Thread the connection cable for the control unit HDG Control
Touch through the recess (1) in the front cladding.
Figure 4/46 - Fitting the front cladding
2
1
Figure 4/47 - Installing the front cladding
4
3
1
2