4 Planning and installation – Installing the heating system
67
18.
Fasten the lower side cladding (5) on the flue side to the front
cladding using the M6 Hexagon socket screws (4+6) (size 4).
19.
Secure the lower side cladding (5) to the rear corner support using
the M6 Hexagon socket screws (1+3) (size 4).
20.
Screw the M6 Hexagon socket screw (2) (size 4) loosely into the
lower side cladding (5) so that the rear cladding can be attached
later.
21.
Hang the flue side upper side cladding (5) onto the front cladding
and rear cladding using the pre-assembled M6 Hexagon socket
screws (1) (size 4).
22.
Secure the upper side cladding (5) on the flue side at the bottom
to the front cladding with the M6 Hexagon socket
screw (6) (size 4).
23.
Fasten the upper side cladding (5) on the flue side at the bottom
to the rear corner support with the M6 Hexagon socket
screw (4) (size 4).
24.
Screw the M6 Hexagon socket screw (3) (size 4) loosely into the
upper side cladding (5), at the bottom, so that the rear cladding
can be attached later.
Figure 4/55 - Installing the side cladding on the flue gas pipe side at the top
2
6
1
4
3
5