4 Planning and installation – Hydraulic connection
30
4.4 Hydraulic connection
✎
See the supplied schematic diagram and electrical circuit
diagram.
4.5 Scope of delivery
The heating system is delivered on a pallet.
Included in the scope of delivery:
•
HDG Euro 30/40/50 boiler
•
Cleaning tools
•
Control unit for HDG Control
•
Accessories
•
Operating documentation
4.6 Installing the heating system
R
EQUIREMENTS
The heating system must be installed by a specialist heating
company and an electrician.
The hydraulic connection depends on the schematic diagram
selected in the respective HDG Control system.
Danger!
Risk of material damage and injury due to incorrect installation
Installing the system requires comprehensive specialist knowledge.
If installed by untrained persons, the heating system can be
damaged and persons may be injured due to secondary damage.
Only allow authorised specialists to perform the installation.
Danger!
Dangerous electrical current or voltage
Working on live components can result in an electric shock.
Switch off the mains supply to the heating system during the
installation.