4 Planning and installation – Installing the heating system
31
I
NSTALLING
THE
BOILER
1.
Remove the packaging from the boiler.
T
RANSPORT
WITH
A
CRANE
2.
Attach suitable lifting equipment, such as a crane, to the eyebolt
(1).
✓
The boiler can now be moved with a crane.
3.
Undo the M8 nuts (3) on the four corners of the boiler (2) using a
13 mm spanner.
4.
Raise the boiler (2) and remove the pallet (4).
5.
Set down the boiler (2) at the planned location while observing
the minimum clearances.
✎
See section “4.2 Structural requirements”, under “Required room
sizes and minimum clearances”.
6.
Align the boiler (2) with plastic plates or flat steel strips (not
included in the scope of delivery) so that it is horizontal.
7.
Remove the eyebolt (1).
8.
Place the cover cap on the control console.
✓
The HDG Euro 30/40/45/50 boiler has been placed in position.
Warning!
Danger from suspended loads
The boiler weighs over 950 kg. If the boiler is dropped during
transport, persons can be seriously injured and the boiler can be
damaged.
When installing the boiler, use suitable lifting equipment.
The boiler packaging can be taken to the local recycling company.
Figure 4/4 - Transport with a crane