5 Commissioning the system – Procedure
43
S
ETTING
THE
AIR
ADJUSTER
PLATE
1.
Open the ash door (2).
2.
Release the three M6 retaining screws (1) using a 10 mm spanner.
3.
Adjust the setting of the air adjuster plate (3) for the technical
burning characteristics of the fuel material.
4.
Retighten the M6 screws (1) with a 10 mm spanner.
5.
Close the boiler in the reverse order.
✓
The air adjuster plate is now set.
Control element
Softwood (e.g. spruce)
Hardwood (e.g. beech) or
chippings
Air slit on air adjuster plate (threshold of
upper ash door)
•
7 mm
•
10–15 mm
Air damper on upright grate flap
•
closed above
•
open halfway below
•
closed above
•
open halfway below
Flat grate
•
bottom
•
raised 55 mm
Table 5/1 - Setting of the primary air guide and grate height
The above settings are suitable for operating the HDG Euro 30/40/
45/50 boiler for materials with technical burning characteristics in
accordance with the recommended fuel.
If other fuels are used, these factory presets may need to be
adapted. To do so, consult an authorised specialist.
Important!
The following described activities may only be performed by
authorised specialists.
Figure 5/1 - Setting the air adjuster plate
3
1
2