5 Commissioning the system – Procedure
42
S
WITCHING
ON
THE
HEATING
SYSTEM
1.
Switch on the circuit breaker for the mains electricity supply, or
otherwise ensure the unit is provided with power.
2.
Turn on the emergency heating switch (if one has been installed).
✓
The heating system is now under voltage.
✓
The indicator lamp in the emergency heating switch will light up.
✓
The control is activated.
✎
See the “HDG Control” operating manual, chapter
“Commissioning the system”.
T
ESTING
SYSTEM
COMPONENTS
P
ROCEDURE
✎
See the “HDG Control” operating manual.
S
ETTING
THE
PRIMARY
AIR
GUIDE
AND
THE
GRATE
HEIGHT
FOR
THE
RESPECTIVE
FUEL
An optimum gasifying of the fuel and thus an efficient combustion
can only be achieved if the boiler is preset for the fuel to be used and
its burning properties. Adapting to the on-site conditions is also of
critical importance.
Important!
For safety reasons, the system component test may only be
conducted when there is no fuel in the boiler and there are no
remaining embers.
The system component test can only be conducted in the “
Ready
”
state.
Depending on the hydraulic system selected, the system
component test must be performed for additional components.
A switching of the basic fuel type, e.g. from softwood to hardwood,
requires a resetting of the boiler to the changed requirements of
the fuel!