6 Using the heating system – Performing a chimney sweep test
58
✓
The HDG Euro 30/40/45/50 boiler is ready for automatic ignition.
6.4 Performing a chimney sweep test
In Germany, there is a legal requirement that heating systems with
nominal thermal power in excess of 4 kW be inspected annually by a
qualified combustion engineer to see that federal emission limits for
small and medium-sized boiler systems are met (1st Federal Emission
Control Ordinance).
I
NITIAL
TEST
The operating company must notify the responsible combustion
engineer of the installation of the heating system before it is
commissioned, and must also arrange an appointment for the
chimney sweep test within four weeks of commissioning. To ensure
a stable operating ability, sufficient heat transfer must occur while
operating at full load.
T
EST
EVERY
TWO
YEARS
In Germany, regular inspections every two years must be carried out
in accordance with the requirements of the federal emission limits
(1.BImSchV).
B
EFORE
THE
TEST
1.
Clean the boiler completely about three to four days before the
chimney sweep test.
✎
See section “7.1 Cleaning and servicing schedule” in Chapter
“7 Cleaning and servicing the heating system”.
2.
Clean the lambda sensor and check that it is securely mounted,
tighten if necessary.
✎
See section “7.1 Cleaning and servicing schedule” in Chapter
“7 Cleaning and servicing the heating system”.
Figure 6/25 - Ready for ignition
Caution!
Material damage and injury due to incorrect chimney sweep test
The chimney sweep test requires comprehensive technical
knowledge.
Only allow authorised specialists to perform the chimney sweep
test.