4 Planning and installation – Structural requirements
24
4.2 Structural requirements
B
OILER
INSTALLATION
SITE
A
PPLICABLE
REGULATIONS
Local building regulations always apply. In Germany, individual state
regulations on boilers and furnaces also apply.
Make sure there is an adequate supply of fresh air to the furnace
room so that there is enough air available for the combustion
process in all of the installed boilers, and to protect the operator from
the hazards of insufficient oxygen.
I
NSTALLATION
A base is not necessary for installation of the boiler. Ensure alignment
on a horizontal plane.
To ensure unhindered operation and maintenance of the heating
system, it is imperative that the heating system is installed in
accordance with the specifications of HDG Bavaria GmbH and that
the minimum spacing requirements are observed.
Also note that the thresholds in DIN 4109 “Soundproofing in building
construction” may not be exceeded.
More detailed information can be found in the relevant local and
national regulations.
We recommend that objects which are not needed for the operation
or maintenance of the heating system are not stored in the furnace
room.
R
EQUIRED
ROOM
SIZES
AND
MINIMUM
CLEARANCES
Building regulations may differ from country to country and state to
state.
For this reason, consult a qualified specialist for the planning and
installation of your boiler room.
Observe the fire safety regulations.
Also observe the accident prevention regulations of the official
safety organisations.
Important!
When installing the pipes for the heating system, observe the
dimensions of the boiler and ensure the minimum clearances.
Summary of Contents for F20
Page 1: ...hdg bavaria com HDG F20 25 30 HDG F40 50 Operating manual ...
Page 2: ......
Page 87: ......