4 Planning and installation – Installing the heating system
31
I
NSTALLING
THE
BOILER
1.
Remove the packaging from the boiler.
2.
Loosen the fastening strap (1) and lift the two side cladding
packages (2) away.
T
RANSPORTING
WITH
A
PALLET
TRUCK
3.
Release the four M8 hexagon nuts (SW13) (2) under the boiler.
4.
Remove the cross member from the pallet (1), from either the
front or rear of the boiler.
5.
Slide the pallet truck (3) under the boiler.
6.
Lift the boiler with a lifting truck (3).
Caution!
Beware of suspended loads.
The boiler weighs over 650 kg. If the boiler is dropped during
transport, persons can be seriously injured and the boiler can be
damaged.
Make sure that you use appropriate lifting gear when placing the
boiler.
Figure 4/4 - Removing the cladding packages
1
2
The boiler packaging can be taken to the local recycling company.
Figure 4/5 - Removing the pallet
2
3
1
Summary of Contents for F20
Page 1: ...hdg bavaria com HDG F20 25 30 HDG F40 50 Operating manual ...
Page 2: ......
Page 87: ......