4 Planning and installation – Installing the heating system
36
5.
Plug the connection cable (4) on the control unit HDG Control
Touch (5) at slot X3.
✎
Also refer to “Electrical plans for the HDG log wood boiler”.
6.
Mount the support plate (1) in the reverse sequence.
F
LOW
/
RETURN
AND
STL
SENSORS
E
XTENSION
MODULE
I
NSTALLING
EXTENSION
MODULE
EM4
1.
Install the EM4 extension module (1) next to the central module
(2).
2.
Connect the EM4 (1) extension module.
✎
See “Electrical plans for the HDG log wood boiler”.
3.
Install the cables and sensors on extension module EM4 according
to the hydraulic wiring diagram.
✓
Extension module EM4 is installed.
The flow/return and STL sensors are already installed upon delivery.
Depending on the hydraulic application, an EM4 extension module
may have to be used.
Important!
If the EM4 extension module is used, this must be installed on the
top next to the central module. If extension module EM8 or EM8+4
is used alternatively or in addition, it must be installed on the
external housing outside the boiler.
✎
For connecting the extension module, see the “Electrical plans
for the HDG log wood boiler”.
Figure 4/11 - Installing the EM4 extension module
1
2
3
Summary of Contents for F20
Page 1: ...hdg bavaria com HDG F20 25 30 HDG F40 50 Operating manual ...
Page 2: ......
Page 87: ......