4 Planning and installation – Installing the heating system
57
8.
Mount the pellet vacuum container cover with the suction turbine
at the rear on the intermediate container using a 4 mm hexagon
socket wrench.
9.
Lay the cable (1) of the suction turbine and the fill level sensor in
the cable channel (2).
✓
The pellet vacuum container has been installed.
I
NSTALLING
THE
WIRING
IN
THE
CONTROL
CABINET
1.
Connect the plug on the control cabinet (1).
✎
See HDG Hydronic circuit diagram.
Figure 4/35 - Installing the pellet vacuum container
2
1
Connect the thermal safety device, which is used here as an
extinguisher, with a suitable flexible hose.
Figure 4/36 - Installing the wiring in the control cabinet
1
Summary of Contents for Pelletmaster 15
Page 1: ...hdg bavaria com HDG Pelletmaster 15 25 Operation Manual V 03 08 2008 ...
Page 2: ......
Page 170: ...170 HDG Pelletmaster 15 25 V 03 en HDG Bavaria GmbH 08 2008 ...
Page 171: ......