4 Planning and installation – HDG hydraulic systems
86
HDG Hydronic
Connection
Connection
Inputs (sensors)
Outputs (units)
F1
not assigned
A1
not assigned
F2
not assigned
A2
not assigned
F3
not assigned
A3
District heating pump
H33
F4
Supply CCT1
H7 / H8
A4
Heating circuit pump CCT1
H27
F5
Supply CCT2
H9 / H10
A5
Heating circuit pump CCT2
H26
F6
not assigned
A6
not assigned
F7
not assigned
A7
Heating circuit mixer CCT1
open
H31
F8
not assigned
A8
Heating circuit mixer CCT1
closed
H32
F9
District heating
temperature
H17 / H18
A9
Heating circuit mixer CCT2
open
H29
F10
not assigned
A10
Heating circuit mixer CCT2
closed
H30
No.
Description
Notes
8-01
Select hydraulic system 3
8-02
Select buffer type
8-04
Set the heating system for heating circuit 1
8-05
Set the heating system for heating circuit 2
8-09
Option of activating district heating mode
8-12
Option of activating an additional heating circuit module
8-00
The settings for the hydraulic system have been
completed
Summary of Contents for Pelletmaster 15
Page 1: ...hdg bavaria com HDG Pelletmaster 15 25 Operation Manual V 03 08 2008 ...
Page 2: ......
Page 170: ...170 HDG Pelletmaster 15 25 V 03 en HDG Bavaria GmbH 08 2008 ...
Page 171: ......