7
2. Orient the Front Stabilizer (3) so that the small
welded tubes are facing away from the Main
Frame (1).
Attach the Front Stabilizer (3) to the Main Frame
(1) with two M10 x 95mm Screws (100).
2
Welded
Tubes
3
1
100
3. Orient the Upright (5) and the Top Cover (27) as
shown, and slide the Top Cover upward onto the
Upright.
Have a second person hold the Upright (5) and
the Top Cover (27) near the Main Frame (1).
Locate the wire tie in the Upright (5). Tie the
lower end of the wire tie to the Wire Harness
(60). Next, pull the upper end of the wire tie until
the Wire Harness is routed completely through
the Upright.
Tip: To prevent the Wire Harness (60) from
falling into the Upright (5), secure the Wire
Harness with the wire tie.
Tip: Avoid pinching the Wire Harness (60).
Slide the Upright (5) onto the Main Frame (1).
Attach the Upright (5) with four M8 x 16mm
Screws (102) and four M8 Split Washers (103);
do not tighten the Screws yet.
Slide the Top Cover (27) downward;
do not
press the Top Cover onto the Frame Covers
(21, 22) yet.
3
Wire Tie
Wire Tie
5
27
60
21
22
1
103
103
102
102
102
Avoid pinching the
Wire Harness (60)