7
2010/2/26 Ver1.0+V1.0
STEP 2.
Attaching the Upper Control Frame to the Main Frame
1.
The first pilot wire and the cable line passes through the frame on the control tube, then on the
control pedestal (B) assembly in frame group (C), bears again afterward the blue color falls receives
in the steamed bread hexagonal screw (a) and spring washer (b) puts down China to take charge of
(c), like chart insertion locking localization then.
Summary of Contents for HC10TVUB
Page 5: ...4 2010 2 26 Ver1 0 V1 0 Assembly Parts...
Page 24: ...23 2010 2 26 Ver1 0 V1 0 Program Control Project Figure level review...
Page 25: ...24 2010 2 26 Ver1 0 V1 0...
Page 26: ...25 2010 2 26 Ver1 0 V1 0...
Page 27: ...26 2010 2 26 Ver1 0 V1 0...
Page 28: ...27 2010 2 26 Ver1 0 V1 0...
Page 29: ...28 2010 2 26 Ver1 0 V1 0...
Page 30: ...29 2010 2 26 Ver1 0 V1 0...
Page 31: ...30 2010 2 26 Ver1 0 V1 0...
Page 32: ...31 2010 2 26 Ver1 0 V1 0...
Page 33: ...32 2010 2 26 Ver1 0 V1 0...
Page 34: ...33 2010 2 26 Ver1 0 V1 0...
Page 35: ...34 2010 2 26 Ver1 0 V1 0...