Hearth & Home Technologies • B41L-AU Installation Manual • 2570-980 Rev. C • 7/20
C. Ceiling Firestop/Floor Penetra-
tion Framing
A ceiling firestop
MUST
be used between
floors and attics.
•
SLP pipe only
- Frame opening 9 in. x 9
in. (229 mm x 229 mm) whenever the vent
penetrates a ceiling/floor (see Figure 5.3).
• Frame the area with the same sized lumber
as used in ceiling/floor joist.
• The ceiling firestop may be installed above or
below the ceiling joists when installed with an
attic insulation shield. It must be under joists
between floors that are not insulated. Refer
to Figure 5.4.
• Secure in place with nails or screws.
WARNING! Risk of Fire!
DO NOT pack insu
-
lation around the vent. Insulation must be kept
back from the pipe to prevent overheating.
Figure 5.3 Installing Ceiling Firestop
Figure 5.4 Installing the Attic Shield
INSTALL ATTIC INSULATION SHIELDS
BEFORE OR AFTER INSTALLATION OF VENT SYSTEM
CEILING FIRESTOP
INSTALLED BELOW CEILING
CEILING FIRESTOP
INSTALLED ABOVE CEILING
ATTIC ABOVE
A
PIPE
SLP
A
9 in. (229 mm)
A
D. Install Attic Insulation Shield
WARNING! Fire Risk. DO NOT
allow loose
materials or insulation to touch vent. Hearth
& Home Technologies requires the use of an
attic shield.
The International Fuel Gas Code requires an
attic shield constructed of 26 gauge minimum
steel that extends at least 2 in. (51 mm) above
insulation.
• Attic insulation shields must meet specified
clearances to combustible materials and be
secured in place.
• An attic insulation shield kit is available from
Hearth & Home Technologies. Contact your
dealer to order. Install attic insulation shield
according to instructions included with kit.