50
Hearth & Home Technologies • B41L-AU Installation Manual • 2570-980 Rev. C • 7/20
Figure 10.8 Finishing Material installed with Passive Heat Optional Heat Management System
2 IN. MIN.
*
DO NOT INSTALL
FINISHING MATERIAL
ON THIS SURFACE.
2 IN. (51 mm) MIN.
OPENING MUST
NOT BE BLOCKED
CEILING
CEILING
2 IN. MIN.
*
DO NOT INSTALL
FINISHING MATERIAL
ON THIS SURFACE.
2 IN. (51 mm) MIN.
OPENING MUST NOT
BE BLOCKED
CEILING
12-1/4 IN.
(311 mm)
8-3/4 IN.
(222 mm)
SIDE DISCHARGE
(DISCHARGE SLOTS ON BOTH SIDES OF APPLIANCE)
FRONT DISCHARGE
OPEN TOP DISCHARGE
= COMBUSTIBLE MATERIAL ALLOWED
*
= Mesh screen required for front discharge or open top discharge passive heat installations with
discharge opening of 3 in. (76 mm) or greater.
(51 mm)
(51 mm)
Finishing Material Installed with Passive Heat Optional Heat Management System