D. Full Reline With Outside Air - Vertical

NOTE: 

Check clearances carefully for this type of 

installation to ensure adequate room for outside air 

venting.

NOTE:

 In Canada only a full reline is allowed per 

ULC 

S628, ORD ULC C1482-M1990

.

Outside Air

 Termination 

at

 Chimney Top

(Vertical)

305mm  min. 

below

305mm min. 

above

NOTE;  Use non-combustible 

materials around exhaust vent pipe 

and seal all edges with 

non-flammable insulation such as 

mineral wool or ceramic.

Do not use high temperature 

caulking materials to seal any edge 

to prevent furture serviceability.

Figure 20.1

NOTE:

 In Canada this fireplace insert must be installed 

with a continuous chimney liner extending from the 

fireplace insert to the top of the chimney. The chimney 

liner must conform to the Class 3 requirements of 

CAN/

ULC-S635, Standard for Lining Systems for Existing 

Masonry or Factory-Built Chimneys and Vents, or 

CAN/ULC-S640, Standard for Lining Systems for New 

Masonry Chimneys

.

Check building codes prior to installation.

•  Installation MUST comply with local, regional, state 

and national codes and regulations.

• 

Consult  local  building,  fire  officials  or  authorities 

having jurisdiction about restrictions, installation 

inspection, and permits.

CAUTION

Summary of Contents for Quadra-Fire CB1200

Page 1: ...restrictions installation inspection and permits CAUTION If the information in these instructions is not followed exactly a fire could result causing property damage personal injury or death Do not s...

Page 2: ...Install Checklist 7 3 Dimensions and Clearances A Appliance Dimensions 8 B Clearance To Combustibles UL and ULC 9 C Masonry Chimney and Fireplace Clearances 10 D Minimum Opening for Masonry ZC Firepla...

Page 3: ...put 10 200 to 33 900 hr BTU Input 17 000 to 48 500 hr Vent Size 3 4 L or PL or 6 Hopper Capacity 75 lbs Fuel Premium Wood Pellets Weighted average LHV Low Heating Value efficiency using data collected...

Page 4: ...ductive harm For more information go to WWW P65Warnings ca gov WARNING F Non Combustible Materials Material which will not ignite and burn composed of any combination of the following Steel Plaster Br...

Page 5: ...stallation MUST comply with local regional state and national codes and regulations Consult insurance carrier local building inspector fire officials or authorities having jurisdiction over restrictio...

Page 6: ...ng the installation to ensure maximum safety and benefit Follow pipe manufacturer instructions for installation and air clearance requirements Tools and building supplies normally required for install...

Page 7: ...ng this checklist for your file That this checklist remain visible at all times on the appliance until the installation is complete Electrical 120 VAC unswitched power provided to the appliance Check...

Page 8: ...8 in 346mm 8 3 4 in 223mm Figure 8 5 Front View with large panel set SP CB12I3350 NB or NL TOP TRIM 18 5 16 in 465mm 24 5 16 in 618mm 50 in 1270mm 33 in 838mm 10 3 8 in 264mm 21 1 4 in 539mm 21 1 4 i...

Page 9: ...art 811 0730 is available through your dealer to be used as a floor protector for the section under the insert body only Floor protection to front and sides of insert appliance must be supplied in add...

Page 10: ...ment for clearances for any measurement in between the maximum and the minimum height The Maximum and minimum are already calculated for you in the above table for convenience E Hearth Extension Use a...

Page 11: ...nt of the insert and 8 inches 203mm to each side of the door opening See Thermal Resistance R value NOTE Clearances may only be reduced by means approved by the regulatory authority having jurisdictio...

Page 12: ...replace opening the portion of the insert extending onto the hearth must be supported Manufacturer designed adjustable support kit can be ordered from your dealer The following is only one example as...

Page 13: ...nce fireplace system must not be altered The flue liner top support attachment must not reduce the air flow for the existing air cooled chimney system NOTE It is necessary to permanently seal any open...

Page 14: ...rts of the structure P 12 in Clearance above roof line for vertical terminations All minimum clearances are listed with an Outside Air Kit OAK installed unless otherwise noted in table below 24 in Abo...

Page 15: ...mands of the pellet appliance but consideration must be given to the total house demand House demand may consume the air needed for the appliance It may be necessary to add additional ventilation to t...

Page 16: ...nce TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE Negative pressure results from the imbalance of air available for the appliance to operate properly It can be strongest in lower levels of the house Cau...

Page 17: ...n Figure 17 2 1 Locate the calculated equivalent feet of pipe on the vertical left side of the chart 2 Move to the right horizontally on the chart until you reach your altitude above sea level 3 If yo...

Page 18: ...Fire Risk Inspection of Chimney Masonry chimney must be in good condition Meets minimum standard of NFPA 211 Factory built chimney must be a minimum 6 inch 152mm UL103 HT WARNING CAUTION Never draw o...

Page 19: ...all or partition of combustible construction is desired the installation shall conform to CAN CSA B365 NOTE Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY Illustrations d...

Page 20: ...ials to seal any edge to prevent furture serviceability Figure 20 1 NOTE In Canada this fireplace insert must be installed with a continuous chimney liner extending from the fireplace insert to the to...

Page 21: ...ke into the home 1 Remove the top vent adapter from the vertical exhaust transition pipe Figures 21 1 and 21 2 2 Using a Phillips head screwdriver and two screws to attach Filler Bracket Figure 21 3 3...

Page 22: ...piece Figure 22 1 5 Install the Rear Panel using six screws Figure 22 2 6 Install the cover plate over the top vent opening using 4 screws Figure 22 3 7 Attach the left shroud panel using eight screws...

Page 23: ...termination cap with second hose clamp 6 Secure termination cap to outside surface 7 Secure trim ring to interior wall Flex Hose Hose Clamp Collar Assembly Trim Ring Hose Clamp Termination Cap Assemb...

Page 24: ...1 and 8 2 D Optional Log Set Placement Instructions NOTE Due to the abrasive nature of a pellet appliance fire the logs are not covered under warranty Any placement variation other than shown here can...

Page 25: ...t and left side curtains are shipped with the insert Figure 25 2 Figure 25 3 Figure 25 4 6 Hold side curtains in open position and lower panel set over insert setting lower edge of top panel in slot b...

Page 26: ...h the opening in the base plate and hold the base against the wall while aligning up to the holes Attach base plate using a Phillips head screwdriver and two screws 5 Connect your thermostat wire to t...

Page 27: ...3280 Part 24 PART NUMBER 811 0872 Spark Arrestor Cap Roof Flashing Storm Collar Joist Shield Firestop Double Wall Connector Pipe Figure 27 1 CAUTION THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR W...

Page 28: ...28 07 22 7027 804H 8 Reference Materials A Service Maintenance List Date of Service Performed By Description of Service...

Page 29: ...f 24 229 1100 24 Y Blower Convection 7000 537 Y 33 Control Board 3 Speed SRV7000 704 Y Fuse 8 Amp Control Box Pkg of 10 812 3780 10 Y 34 Wire Harness SRV7000 155 Y Fuse 7 Amp Junction Box Pkg of 10 81...

Page 30: ...832 0840 Logo Quadra Fire Pkg of 10 7000 649 10 Trim Panel Set Ots Nickel 510 5220 Panel Set Large W Black Nickel Trim 33 in x 50 in SP CB12I3350 NB Bracket L Trim Pkg of 2 832 0840 Logo Quadra Fire...

Page 31: ...31 07 22 7027 804H...

Page 32: ...maintenance instructions included Read understand and follow these instructions for safe installation and operation Leave this manual with party responsible for use and operation of this appliance We...

Reviews: