Hearthstone Quality Home Heating Products, Inc.
BARI Model #8180
O
THER
I
NSTALLATIONS
B
OLTING YOUR
B
ARI
G
AS TO A
P
ERMANENT
S
TRUCTURE
When installing the Bari in a mobile home it is
required that you bolt it down. To do this, we have
provided a rear bolt down kit with the unit. Locate
the 2 steel plates and remove them from the
packaging. Attach the first panel to the stove using
the 2 allen head bolts provided.
(See figure 16)
Attach the second steel plate to the first one also
using 2 allen screws . (
See Figure 17)
Figure 16
Figure 17
Leave the screws loose. Next, slide the rear plate up
tight to the wall. Using two large screws (not
provided), screw the steel plate to the framing in the
wall. Once the screws are in place and the stove is
in its proper location, tighten the two screws that
hold the two plates together.
H
IGH
A
LTITUDE
I
NSTALLATIONS
For installations from 610-1370 meters (2000-
4500ft) the orifice sizes (DMS) should be 38 for NG
and 53 for LP. See the rating label for more
information. For high altitude installations consult the
local gas distributer or the authority having
jurisdiction for proper rating methods. If the installer
must convert the unit to adjust for varying altitudes,
the information sticker (similar to the one shown
below) must be filled out by the installer and
adhered to the appliance at the time of conversion.
(
Cet appareil est equipe pour des altitudes
compries entre 0 et 2000pieds (0-610m) seulment).
26