HearthStone Quality Home Heating Products Inc
STOWE Gas-Fired Direct Vent heater
27
3. Gently place the Main Log (1) in the
firebox against the center of the back
wall.
4. Gently place the Top Log (2) on top
of the Main Log (1), inserting the
posts into the holes in the bottom
side of the Top Twig.
5. Spread evenly across the Ember
Screen, one layer high, the 2 ounces
of Charcoal Embers (5). You will not
need to use all of the Charcoal
Embers. Keep the rest in to use in the
future.
6. Make sure the front is properly
secured to the firebox before turning
the unit on. Be careful not to chip the
enamel when fastening front.
7. Grasp the cast façade and slide the
top edge under the lip of the top
castings. Push the bottom of the
façade in towards the firebox. While
pushing in, pull the latch down to
secure the façade to the firebox.
Figure 9 Log Set Assembly.
#1 Main
Log
#2 Top
Log