58
Your door trim and metal threshold are now installed.
Install 64" metal threshold with (11) 3/4" screws.
3
(11) Special Coating Screws
PARTS REQUIRED:
DOORS
BEGIN
1
Center trim
ZJ
over doors and secure
with (7) 2" finishing nails into framing, as shown.
2
Arrange trim
CYL
and
CYR
as shown.
Flush parts in corners of installed trim.
Fasten trim to each door from inside with 3/4" screws
(Fig. A, Fig B)
.
FINISH
3/4"
(1,9 cm)
Screws
CYL
CYL
CYR
CYR
ZJ
x1 ZJ
19/32" x 2-1/2" x 72" (1,5 x 7,6 x 182,9 cm)
3/4" (1,9 cm)
x72
2"
(5,1 cm)
Finishing Nails
2" (5,1 cm)
x7
You have 3 options for door trim, see Fig. C.
Fig. B
Trim Option 2
Customize your door trim; use 1 of 3 options:
Assembly for Option 1 is shown in Fig. A.
If you choose Option 2, reverse CYL and CYR.
If you choose Option 3, make no modifications
to doors.
Add or subtract more screws as needed.
Trim Option 3
Fig. C
Fig. A
AH
CYL or CYR
CYL or CYR
Trim Option 1
CENTER
CENTER
CENTER
x1
64" Metal Threshold
3/4" (1,9 cm) x11
Bagged seperately / special coating
19/32" x 2-1/2" x 41-3/4" (1,5 x 6,3 x 106 cm)
CYR
x2
CYL
x2
19/32" x 2-1/2" x 41-3/4" (1,5 x 6,3 x 106 cm)