67
Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15
STEP 7.
LOG #6 (SRV2005-705): Locate the notch on log #6 and place it against the front right grate tine. Set the
other end of the log so it rests on the
fl
at area of log #1. The orientation of log #6 in relation to the grate tine is shown
below.
66
55
44
33
22
11
1
2
44
55
33 22
11
FLAT AREA
FLAT AREA
Notch
Notch
Log Assembly Installed.
Notch engaged with
Notch engaged with
grate tine.
grate tine.